Click on any of the images below to see larger (800x600)
versions.
Day One: Out with the
old!
I didn't get a picture of the first dumpster-full of demolition
debris, but it was completely full! These last few dumpster pictures
show what's in there so far for the second load. The couch and
chair should be gone tomorrow (one of the workers is going to take
it). The plywood will be replaced with real framing and preparation
for the new (outside) stucco work and roof repair. The new sliding
glass door should also go in tomorrow (if all goes as planned), and
they may start on some of the new electrical work (which now includes
a new 50 amp subpanel in the garage).